1st Teardown While I Build Up

Discussion in 'Mazdaspeed 3 Build Diaries' started by Awines2326, Oct 29, 2024.

Watchers:
2 users.
  1. Awines2326

    Awines2326 Silver Member

    Joined:
    Aug 9, 2023
    Posts:
    37
    Trophy Points:
    8
    Location:
    Pleasant Lake MI
    Ratings:
    +16 / -0
    Exhaust side is 90% complete! Finish up the last little polish touch-up and I can be done with that side! 20250108_131950.jpg 20250108_131938.jpg 20250108_131922.jpg 20250108_131931.jpg 20250108_131915.jpg
     
    Awines2326, via a mobile device, Jan 8, 2025
    #21
    • Like Like x 1
  2. Awines2326

    Awines2326 Silver Member

    Joined:
    Aug 9, 2023
    Posts:
    37
    Trophy Points:
    8
    Location:
    Pleasant Lake MI
    Ratings:
    +16 / -0
    Alright I think I'm finished all the way around. Now, it's gotta go to the machine shop for new guides and a valve job for these new supertech valves 20250108_165339.jpg 20250108_165253.jpg 20250108_165249.jpg 20250108_165238.jpg 20250108_165228.jpg 20250108_165157.jpg 20250108_165143.jpg 20250108_165119.jpg 20250108_165100.jpg 20250108_164808.jpg 20250108_164753.jpg 20250108_164735.jpg 20250108_164731.jpg
     
    Awines2326, via a mobile device, Jan 8, 2025
    #22
    • Like Like x 2
Loading...

Share This Page

Users Viewing Thread (Users: 0, Guests: 0)